Programme/ Project : Flood Recovery Programme (Cash for Work and Family Shelter Construction)
Duration : 01.10.2004- 31.12.2005
Budget (BDT) : 51,000,000
Source of Fund/Donors : UNDP and Bangladesh Nazarene Mission (BNM)
Geographical Coverage : Dist: Sirajganj Uz: 5 nos. (Sirajgonj (s), Kazipur, Raigonj Belkuchi and Ullahpara) Union: 22 nos.
Major Outputs/Results Achieved
- Re-constructed roads (72km) contributed towards reducing local flood vulnerability
- 274 family shelter recipients are safe and secured
- Raised community grounds (79) are properly used
- 22 Hat-bazars developed are used by the community
- Reduced flood vulnerability to 1,788 raised homestead plinth owners (13,411MD)